This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision Next revision Both sides next revision | ||
elibrary-partnership [2020/06/19 01:31] serbizadmin |
elibrary-partnership [2020/07/12 16:54] serbizadmin [Table] |
||
---|---|---|---|
Line 7: | Line 7: | ||
The eLibrary is a **platform** of engagement, for getting together to help improve K-12 instruction, | The eLibrary is a **platform** of engagement, for getting together to help improve K-12 instruction, | ||
\\ | \\ | ||
- | {{tablelayout? | + | {{tablelayout? |
- | ^ What's new? ^ | + | ^ What's new? ^ |
- | |[[Physical Assembly of Tambayayong eLib Box]]| | + | | [[Physical Assembly of Tambayayong eLib Box]] | |
- | |[[kaisipan-box|The Kaisipan Box and its use cases]]| | + | | [[https:// |
- | |[[engagement-flow-for-tambayayong-elib-box|The eLib Project Engagement Flow]]| | + | | [[kaisipan-box|The Kaisipan Box and its use cases]] |
- | |[[https:// | + | | [[engagement-flow-for-tambayayong-elib-box|The eLib Project Engagement Flow]] |
+ | | [[https:// | ||
\\ | \\ | ||
\\ | \\ | ||
Line 106: | Line 107: | ||
\\ | \\ | ||
===== Project Cost and Sustainability ===== | ===== Project Cost and Sustainability ===== | ||
- | * Direct Cost. The direct cost of the Project is related to the hardware necessary to deploy either the [[elibrary-system|Tambayayong eLibrary System]] (TeLS) or the [[library-box|Library in a Box]]. Schools with hundreds or thousands of students will likely need the former, which means deploying enterprise servers (ranging from P50,000 to P150, | + | * Direct Cost. The direct cost of the Project is related to the hardware necessary to deploy either the [[elibrary-system|Tambayayong eLibrary System]] (TeLS) or the [[library-box|Library in a Box]]. Schools with hundreds or thousands of students will likely need the former, which means deploying enterprise servers (ranging from P50,000 to P150, |
* Indirect Cost. Indirect costs (like accommodation and fare) are shouldered by project partners. | * Indirect Cost. Indirect costs (like accommodation and fare) are shouldered by project partners. | ||
* Sustainability. See [[Tambayayong eLibrary Project Sustainability]]. | * Sustainability. See [[Tambayayong eLibrary Project Sustainability]]. |