This shows you the differences between two versions of the page.
Both sides previous revision Previous revision | Next revision Both sides next revision | ||
elibrary-partnership [2020/06/19 01:31] serbizadmin |
elibrary-partnership [2020/06/19 01:35] serbizadmin [Project Cost and Sustainability] |
||
---|---|---|---|
Line 106: | Line 106: | ||
\\ | \\ | ||
===== Project Cost and Sustainability ===== | ===== Project Cost and Sustainability ===== | ||
- | * Direct Cost. The direct cost of the Project is related to the hardware necessary to deploy either the [[elibrary-system|Tambayayong eLibrary System]] (TeLS) or the [[library-box|Library in a Box]]. Schools with hundreds or thousands of students will likely need the former, which means deploying enterprise servers (ranging from P50,000 to P150, | + | * Direct Cost. The direct cost of the Project is related to the hardware necessary to deploy either the [[elibrary-system|Tambayayong eLibrary System]] (TeLS) or the [[library-box|Library in a Box]]. Schools with hundreds or thousands of students will likely need the former, which means deploying enterprise servers (ranging from P50,000 to P150, |
* Indirect Cost. Indirect costs (like accommodation and fare) are shouldered by project partners. | * Indirect Cost. Indirect costs (like accommodation and fare) are shouldered by project partners. | ||
* Sustainability. See [[Tambayayong eLibrary Project Sustainability]]. | * Sustainability. See [[Tambayayong eLibrary Project Sustainability]]. |